New construction of a central refrigeration device including infrastructure for Daimler plant 54 Rastatt
Construction management (work phases 8 and 9 according to HOAI) for a new construction project with an order value of € 1.55 million for the new “refrigeration center” at the Daimler plant 54, Rastatt
Service elements:
- construction site clearance
- Relocation of buried supply media – such as heating water, drinking water, industrial water, sprinkler pipes and pipes for compressed air
- Relocation of 2,800 m steel cold water pipes as preinsulated pipe (KMR) DN 450, 100 m preinsulated pipes DN 300 and 450 m in preinsulated pipes DN 200 (completely underground)
- New construction of a total of 5 shaft structures, the technically demanding plant construction (DN 15 — DN 450)
- New building of a connecting structure and a complete building equipment for the integration of the newly built cooling infrastructure network in the demanding plant construction of Daimler factory premises 54, Rastatt
- Manufacture of an effective “Armaflex” — cold insulation for all non-buried pipe components to achieve an effective cold loss minimization
-